IMG_5798“Guess I’m outta work” was what the electrician said mid-afternoon Thursday when he wrapped the last solar j-box lugs on the roof.  It was the culmination of an intense week of work and scheduling trying to get this solar array completed before a self-inflicted deadline of September 1st.  He’d wedged me into his already tight schedule thinking it would take about 3 days and we’d finished a conduit run, pulled 150′ of 4 conductor 3 stories, made up a complicated merging of two arrays electrical and tied it into the grid in a little over a day and a half.

IMG_5816

Several reasons for the accelerated schedule, besides an ADHD owner, was that we’re leaving for Switzerland on the 1st of September and the rebate deadline with the local power company is on October 1st (which when you’re moving at faux-mach speed was thought to be September 1st).  And you may not have known, as I didn’t until very late in my life, dyslexics are narrow-focused folks.

IMG_5790Close family and friends like Chris, Mike, Will and Kurt put up with short notice, lending a hand or two when the impulse demanded. The electrician, like the roofer, was a required expenses due to this being an HOA installation but we could do all the design, materials acquisition, grunt work and assembly that didn’t require a licensed contractor.

Last step(s) are out of our hands: Electrical inspection and meter change which allows us to throw the double pole breaker reversing the meter, sending 3.5 kw back to the grid.  And of course replacing the usage for the condo.  It’s the right thing to do.